• 37'524 m²

    Leasable Area

  • 7.1 ha

    Master-Planned Site

  • 4 BLOCKS

    Independent Blocks

  • 102 DOCKS

    Loading Docks

LOCATION & CONNECTIVITY

Location is part of the operating model

Direct access to Tashkent’s M39 ring road connects the hub to the city, airport, customs infrastructure and regional freight corridors.
18 km
International Airport
Efficient air freight access for pharmaceuticals and high-value cargo
12 km
City Centre
Fast last-mile delivery and retail replenishment across Tashkent
8 km
Customs & Dry Port
Faster access for containers and international shipments
15 km
Rail Freight Hub
Access to regional freight corridors, including trans-Caspian routes
Site Infrastructure
Fully connected infrastructure on site.
  • Power

    Dedicated power substation connected to the development

  • Water

    Water supply connected within the development

  • Sewerage

    On-site sewerage infrastructure already connected

  • Telecom

    Telecom connectivity available across the park

CONFIGURATION

4 independent blocks. Multiple operating models.

The hub combines four independent blocks with divisible space and build-to-suit flexibility for different operating requirements. Leasing opportunities from 7'140 m².
  • 7'140 m²

    17 docks ~420 m² / dock
  • 12'240 m²

    30 docks ~400 m²/ dock
  • 7'776 m²

    23 docks ~340 m²/ dock
  • 10'368 m²

    32 docks ~320 m²/ dock
  • TOTAL

    37'524 m² / 7.1 ha
Designed to support different operating requirements
TECHNICAL PERFORMANCE
12 m
Clear Height
8 t/m²
Floor load
12 × 24 m
Column grid
102
Loading Docks
35 m
Truck Yard
47 TIR
Spaces
The specification combines high-bay storage, heavy floor loading, efficient vehicle circulation and adaptable temperature control.
OPERATING CONDITIONS

Flexibility is built into the asset

Four independent blocks can be configured for different operating models — from ambient dry storage to chilled and frozen environments.
  • Ambient

    Dry Storage

    +16°C to +25°C

  • Chilled

    Fresh & Pharma

    +2°C to +6°C

  • Frozen

    Deep Freeze

    −25°C and below

  • SAFETY

    ESFR / NFPA

    Fire Protection Standard

*Every block can be adapted as operating requirements evolve.

TARGET OCCUPIERS

Designed for different industries. Built around demanding operations.

The hub is configured for pharmaceutical distribution, cold chain, retail, e-commerce and multi-client logistics — with space designed around different operating requirements.
ESG & OPERATING PERFORMANCE

Performance continues after handover

The hub is designed around international sustainability standards, resource efficiency and lower long-term operating costs.
  • EDGE Advanced
    Designed for high resource efficiency and reduced operating impact.
  • BREEAM Good
    Designed around recognised sustainability benchmarks
  • ≥ 41%
    Energy savings target
  • ≥ 30%
    Water savings target
  • ≥ 31%
    Embodied carbon reduction
  • ≥ 2'300 tCO2/Y
    Estimated annual carbon savings

Energy-efficient envelope, LED lighting, VRF systems, demand-controlled ventilation and a solar-ready roof support lower resource consumption across the asset lifecycle.

Request Leasing Terms

Connect with our commercial team to receive a tailored leasing proposal

DELIVERY & CERTAINTY

A defined delivery programme. One accountable EPC partner.

Greystar manages the development through an integrated EPC model, with completion targeted for May 2027.
  • MAY 2027
    Target Completion
  • FIDIC
    Contractual Framework
  • 10 DAYS AHEAD
    Korzinka benchmark
  • WITHIN BUDGET
    Previous flagship delivery
COMMERCIAL TERMS

Space that adapts to the way you operate

The hub is developed in a build-to-suit (BTS) format, allowing layouts, fit-out and selected technical solutions to be adapted to tenant requirements.

FROM 7'140 m²

Minimum block
5–10 YEARS
Preferred lease term
FIT-OUT
Turnkey adaptation available
LEASE OR PURCHASE
Flexible structure

Ready to define your space requirements?


Tell us your required area, operating model and target move-in date.

GreyStar*
Delivering industrial real estate through one integrated EPC responsibility — combining European engineering standards with predictable execution across Central Asia.
Navigate
EPC Contractor
Tashkent Hub
Company
ESG
News
Contacts
Address
5A Shahrisabz Street, Tashkent, Uzbekistan
All rights reserved © Greystar 2026.
Privacy Policy
Brand Kit
Back to top
Made on
Tilda